Nexus Apartments

Location:

Waurn Ponds Geelong

Project Overview:

Lane Entry and Driveway for Apartment Complex

  • Road works for Vic Roads compliance.
  • This included matching in exiting stormwater works previously installed by others.
  • 2500 m2 of pavement construction.
  • 1200 m2 of asphalt.
  • 320 lin.m of kerb preparation and installation.
  • Stormwater installation to replace open swale drain and connect into existing stormwater pit.
  • Power conduit, cable and light pole works.

Project Challenges

  • Working in with other trades when trying to construct the carparking area.
  • Constructing the entry and exit while operational to trades, deliveries and visitors was required.
  • The entry and exit works heavily involved working on Colac Road (VicRoads) which had time constraints enforced resulting in limited working hours.