Salt Basin

Location:

Torquay

Project Overview:

Retarding Basin Wetlands

  • Bulk earthworks to remove 8,000M3 of clay to provide the foundation of the basin at designed levels, including a clay liner to basin.
  • Drainage and storm water pit installation around the basin to allow storage and release of water when required.
  • Build 5m high retaining walls around the perimeter of the basin and landscape.
  • Construct Gabions, fencing and landscape elements.
  • Contruct overflow area designed for a 1 in 100-year storm.

Project Challenges:

  • Facing the 5m wall with Gabion baskets.
  • Confined entry and access.
  • Working with high walls and deep excavations.

Client:

Spiire